WEG MediaWiki

Difference between revisions of "DATE Production Status Europe"

m (Added category DATE)
m (Updated comments/input)
Line 1: Line 1:
'''SAMPLE status tracking table.'''
+
 
 
{| class="wikitable"
 
{| class="wikitable"
 
| colspan="6" |            '''<u>DATE  – Europe Status</u>'''                     
 
| colspan="6" |            '''<u>DATE  – Europe Status</u>'''                     
Line 20: Line 20:
 
|Done
 
|Done
 
|Done
 
|Done
|Working
+
|Done
|ODIN Entry
+
|Done
 
|Done
 
|Done
 
|-
 
|-
Line 27: Line 27:
 
|Done
 
|Done
 
|Done
 
|Done
|Done
+
|Working (Evans)
|ODIN Entry
+
|Working (Evans)
|Done
+
|Working (Evans)
 +
|-
 +
|'''Criminal Organizations'''
 +
|Working (M. Williams)
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
 
|'''Economic'''
 
|'''Economic'''
Line 82: Line 89:
  
 
====== ============================================================ ======
 
====== ============================================================ ======
'''SAMPLE ONLY'''
+
Comment/Input
 +
 
 +
> (26 June 18) 
 +
 
 +
- Finish Arnland Summary for ODIN entry NLT 29 June.
 +
 
 +
- DATE Europe working meeting to discuss current status and way ahead
  
Comment/Input
+
- Jamie & Wayne to work synchronization across DATE Europe countries
  
- (26 June 18) Finish Arnland Summary for ODIN entry NLT 30 June.  
+
- Wayne to talk with Keith in reference to the individual country maps as well as infrastructure information (KML files) available.
  
-
 
 
{{:Europe Linkbox}}
 
{{:Europe Linkbox}}
 
[[Category:Europe]]
 
[[Category:Europe]]
 
[[Category:DATE]]
 
[[Category:DATE]]

Revision as of 19:45, 26 June 2018

DATE – Europe Status
  Torrike Bothnia Framland Arnland Otso
Summary Working Working Working Working Working
Political Done Done Done Done Done
Military Done Done Working (Evans) Working (Evans) Working (Evans)
Criminal Organizations Working (M. Williams)
Economic Done Done Done ODIN Entry Done
Social Done Done Done ODIN Entry Done
Information Done Done Done ODIN Entry Done
Infrastructure Done Done Done ODIN Entry Done
Physical Environment Done Done Done Done Done
Time Done Done Done Done Done
Maps Working Working Working Working Working
============================================================

Comment/Input

> (26 June 18)

- Finish Arnland Summary for ODIN entry NLT 29 June.

- DATE Europe working meeting to discuss current status and way ahead

- Jamie & Wayne to work synchronization across DATE Europe countries

- Wayne to talk with Keith in reference to the individual country maps as well as infrastructure information (KML files) available.


DATE Europe Quick Links .
Arnland
Bothnia
Donovia-West
Framland
Otso
Pirtuni
Torrike
Other
Retrieved from "http://odin.ttysg.us/mediawiki/index.php?title=DATE_Production_Status_Europe&oldid=10348"