WEG MediaWiki

Difference between revisions of "DATE Production Status Europe"

m (Updated comments/input)
m (============================================================: Added notes to indicate these are sample entries.)
Line 1: Line 1:
  
 
{| class="wikitable"
 
{| class="wikitable"
| colspan="6" |            '''<u>DATE  – Europe Status</u>'''                     
+
| colspan="6" |            '''<u>DATE  – Europe Status (EXAMPLE)</u>'''                     
 
|-
 
|-
 
|''' '''
 
|''' '''
Line 93: Line 93:
 
> (26 June 18)   
 
> (26 June 18)   
  
- Finish Arnland Summary for ODIN entry NLT 29 June.  
+
- (SAMPLE entry) Finish Arnland Summary for ODIN entry NLT 29 June.  
  
 
- DATE Europe working meeting to discuss current status and way ahead
 
- DATE Europe working meeting to discuss current status and way ahead
Line 100: Line 100:
  
 
- Wayne to talk with Keith in reference to the individual country maps as well as infrastructure information (KML files) available.
 
- Wayne to talk with Keith in reference to the individual country maps as well as infrastructure information (KML files) available.
 +
 +
> (28 June 18)
 +
 +
-
  
 
{{:Europe Linkbox}}
 
{{:Europe Linkbox}}
 
[[Category:Europe]]
 
[[Category:Europe]]
 
[[Category:DATE]]
 
[[Category:DATE]]

Revision as of 15:04, 28 June 2018

DATE – Europe Status (EXAMPLE)
  Torrike Bothnia Framland Arnland Otso
Summary Working Working Working Working Working
Political Done Done Done Done Done
Military Done Done Working (Evans) Working (Evans) Working (Evans)
Criminal Organizations Working (M. Williams)
Economic Done Done Done ODIN Entry Done
Social Done Done Done ODIN Entry Done
Information Done Done Done ODIN Entry Done
Infrastructure Done Done Done ODIN Entry Done
Physical Environment Done Done Done Done Done
Time Done Done Done Done Done
Maps Working Working Working Working Working
============================================================

Comment/Input

> (26 June 18)

- (SAMPLE entry) Finish Arnland Summary for ODIN entry NLT 29 June.

- DATE Europe working meeting to discuss current status and way ahead

- Jamie & Wayne to work synchronization across DATE Europe countries

- Wayne to talk with Keith in reference to the individual country maps as well as infrastructure information (KML files) available.

> (28 June 18)

-


DATE Europe Quick Links .
Arnland
Bothnia
Donovia-West
Framland
Otso
Pirtuni
Torrike
Other
Retrieved from "http://odin.ttysg.us/mediawiki/index.php?title=DATE_Production_Status_Europe&oldid=10361"